Unique
Projects | Back to Portfolio
DiGesare
Mechanical combines an extensive wealth of knowledge and diverse
project experience from various sectors t construct projects of a
unique nature for a wide variety of clients. Effectively combining
design, engineering and construction in a unique context requires
focused project management. The DMI Team recognizes that effective
project management is achieved through aggressive schedule control,
budget control and quality control. DiGesare Mechanical relies on
the companies own practical experience gained through the wide
variety of projects it has completed to ensure successful projects
for al of the company's clients. Even the most specialized designs
are completed on time and within budget, assuring every instruction
is followed to the finest detail.
|
|

|
|
|
|
Albany
International Airport
New Terminal and Concourse
Plumbing & Fire Protection
DMI Contract – 3.6 Million
|
|
|
|
Projects such as the 110 million dollar Albany International Airport required the capability to perform around critical operating facilities and under very challenging milestone deadlines. DMI proved it was up to the task when it signed on to install a complete Plumbing and Fire Protection system for this new 250,000 square foot, self-contained passenger terminal complex. This complex houses the three concourses, an art gallery, baggage claim, ticketing as well as well as several restaurants, police and security offices, a post office and many gift shops. In addition to the main terminal and concourse levels, DMI was additionally awarded the Plumbing and HVAC contracts for several support buildings. The first, a stand alone garage and maintenance facility in which DMI installed a complete Plumbing, Heating, Ventilating and Air Conditioning system as well as dual compartment fuel oil storage tanks complete with a computerized fuel inventory control system, fuel pumps, interstitial monitoring system and automatic fire suppression system. The second support building, the Air Rescue and Firefighting Facility called for DMI to install a complete Plumbing and Fire Protection system as well as the installation stainless steel piping for a diethylene glycol foaming system.
|
|
|
New York Giants Training Facility
General Construction, Plumbing & HVAC
DMI Contract – 2.2 Million
|
|
|
|
When the New York Giants selected the State University at Albany for their spring training camp they needed the facility retrofitted to suit their needs and they needed it in nine weeks. DMI was awarded a multi million-dollar Mechanical / General Construction contract to retrofit the existing arena, which required the installation chillers and chilled water piping to cool an 180,000 square foot sports complex. DMI completed the project ahead of schedule allowing the Giants to begin training camp on time, and as a result was awarded a substantial five-figure early completion bonus.
|
|
|

Upgrade
Chiller Plant - New York State Campus
HVAC
DMI Contract – 2.6 Million
|
|
|
On this project DMI had to remove two large
existing chillers, ten base mounted pumps and thousands of pounds of steel pipe. In it's place we furnished and installed two 1,000 ton
centrifugal chillers, fifteen 200 horsepower vertical inline split case
pumps, each pump capable of delivering 6,000 gallons of chilled water per minute and piping up to 36" in diameter. DMI was given a nine-week window in which to remove the old cooling systems and install the new. Careful, day by day scheduling and
utilization of prefabrication to the maximum extent possible resulted in bringing the
high efficient chillers online ahead of schedule which in turn resulted in a savings of $75,000 a month in utility costs to the State of New York.
|
|
|

Recreation and Convocation Center
SUNY at Albany
Plumbing & HVAC
DMI Contract – 2.5 Million
|
|
|
Located on the University at Albany State Campus, the SUNY Field House, known on campus as The
R.A.C.C. was built to accommodate the college's increasing student population, as well as host as The Great Danes basketball and volleyball teams. The facility is used year round for sporting events and concerts. DMI was proud to have been the mechanical contractor for this 200,000 sf facility which houses locker rooms, racquetball courts, a nautilus room, indoor track, basketball and volleyball courts as well a 4583 seating capacity gymnasium.
|
|
|
|
|
|
|
|
|